翻訳と辞書
Words near each other
・ New Livingstone Stadium
・ New Llano, Louisiana
・ New Local Government Network
・ New localism
・ New Lodge
・ New Lodge, Belfast
・ New Lodge, South Yorkshire
・ New Logie Green
・ New Logus Block
・ New London
・ New London Academy
・ New London Academy (Pennsylvania)
・ New London Academy (Virginia)
・ New London Airport
・ New London Airport (Virginia)
New London and East Lyme Street Railway
・ New London Architecture
・ New London Chamber Ensemble
・ New London Children's Choir
・ New London Chorale
・ New London Consort
・ New London County Courthouse
・ New London County RFC
・ New London County, Connecticut
・ New London Customhouse
・ New London Graduate School
・ New London Harbor Light
・ New London Heritage Trail
・ New London High School
・ New London High School (Connecticut)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

New London and East Lyme Street Railway : ウィキペディア英語版
New London and East Lyme Street Railway

The New London and East Lyme Street Railway was a streetcar line that operated in southeastern Connecticut. Its main line ran from New London to Niantic with a later extension to Crescent Beach and a branch to Old Saybrook. The main portion of the line opened on October 5, 1905.〔
==Route==
The line began at the Parade in downtown New London, adjacent to New London Union Station. Cars ran on trackage rights over Connecticut Company local lines along Bank Street to the beginning of NL&EL trackage at Montauk Avenue. The route ran alongside the Boston Post Road (now U.S. Route 1) to Oswegatchie, where a carhouse was located on Niantic River Road. The line ran south on Niantic River Road, crossed Smith Cove (what is now Keeny Cove) on a high trestle, and followed Oswegatchie Road to where it rejoined the Post Road at Keeney's Corner. At Golden Spur (where the Post Road crossed the Niantic River), the company built the Golden Spur Amusement Park to draw weekend ridership. From Flanders Four Corners, the line ran south along Flanders Road (now CT-161) to the New Haven Railroad's Niantic station on Main Street (CT-156) in downtown Niantic. From Montauk Avenue to Niantic, the company operated 11.00 miles of main track and 0.14 miles of passing sidings.〔
The 1912 extension to Crescent Beach added 1.00 mile of main track, running along Main Street and Black Point Road to near the Crescent Beach station. Trolley wire was erected over the freight siding to the Connecticut National Guard camp in Niantic, with trolleys providing 'less than carload' freight service.〔
The 1913 branch to Old Lyme followed the Post Road from Flanders Four Corners to Old Lyme, then over the Connecticut River bridge where it met with the Shore Line Electric Railway. The branch added 11.27 miles of main track and 0.28 miles of passing sidings.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「New London and East Lyme Street Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.